The use of Double Wall system LGS as enclosing structures leads to a reduction in the cost of construction and significantly reduces the time for the erection of buildings. The production of the necessary materials (wall panels and lightweight concrete) can be placed directly on the construction site. Due to this, the costs for logistics, loading and unloading operations, including a rise to the upper floors, are reduced. The "wall layers" of the wall is extremely simple. And in terms of energy efficiency indicators, the building meets the requirements of "passive house".
kub-tur
Comments